M3 déli szakasz: Ecseri út

    Location: 1091 Budapest, Ecseri útCompletion: 2020
    Used materials: perforated EQUITONE fiber cement cladding, concrete elementsGeneral constructor: Strabag Zrt.
    M3 déli szakasz: Ecseri út

    To complete the infrastructure of the southern section of the M3 metro line, our team contributed by CNC machining the unique fiber cement cladding of the platform.

    With more than 2500 different sizes, shapes and types of cladding elements. In addition to the production of unique EQUITONE elements, our team was also responsible for the structural design and construction of concrete paving elements that stand out from the crowd. The design of the special shaped elements and the installation of the five-metre long, three-dimensional concrete paving elements was a major challenge due to the limited space and the weight of the elements, which weighed almost 800 kg. The renewed Ecseri út station on the southern section provides a fresh architectural experience, while also reflecting the past. In addition to a clean and modern look, the new section of the line will not only be more comfortable but also safer and more energy-efficient for returning passengers, while maintaining a contemporary feel with clean and transparent spaces.

    M3 déli szakasz: Ecseri út - 1
    M3 déli szakasz: Ecseri út - 2
    M3 déli szakasz: Ecseri út - 3
    M3 déli szakasz: Ecseri út - 4
    M3 déli szakasz: Ecseri út - 5
    M3 déli szakasz: Ecseri út - 6
     

    Design and build your own building with us - Ask for an offer!